The gates will be mounted at the side of two holding bins. They will introduce coal to a conveyor belt located directly beneath the bins. The belt transports the coal to a size reduction mill.
This Vortex 3-way Titan-Lined Diverter features replaceable, interior liners constructed of abrasion-resistant steel (400BHN) to combat wear from the material handled.
This hand wheel Titan Maintenance Gate & pneumatically actuated Titan Slide Gate stack up is used to control the flow of finely-ground limestone into a Vortex Aero-Slide for conveyance & transport.